Natural Oak Flooring Installation
& Preparation of the base
Project Description
Installation of new wooden flooring in one room. Preparation work to include removing and disposing of the existing floorboards. To supply and fit 50mm thermal insulation between the joists. Supply and fit 18mm WBP plywood onto the existing joists, as a base for the new flooring. To supply flexible parquet adhesive for the flooring installation. To supply & install engineered oak flooring 15mm total thickness, 190mm wide, rustic grade, brushed & oiled finish. The flooring to be fully bonded onto the base using flexible parquet adhesive. Supply and fit pine beading around the edges to cover the expansion gap. The beading will require painting with the skirting after installation.
Learn more about our Flooring Installation Service
Learn more about our Sub-Floor Preparation Service
Project Gallery
Quality Flooring Specialists








